Your One-Stop Shop for Third Party Special Inspections

Schedule and coordinate your inspections through our mobile-friendly project management system and our robust support staff will track and remind you of any outstanding inspections

 

Special Inspections:

  • Structural Steel—Welding

  • Structural Steel—Details

  • Structural Steel—High Strength Bolting

  • Structural Cold-Formed Steel

  • Concrete—Cast-In-Place

  • Concrete—Precast

  • Concrete—Prestressed

  • Masonry

  • Wood—Installation of High-Load Diaphragms

  • Wood—Installation of Metal-Plate-Connected Trusses

  • Wood—Installation of Prefabricated I-Joists

  • Subgrade Inspection

  • Subsurface Conditions—Fill Placement & In-Place Density

  • Subsurface Investigations (Borings/Test Pits)(TR4)

  • Deep Foundation Elements (TR5)

  • Helical Piles

  • Vertical Masonry Foundation Elements

  • Wall Panels, Curtain Walls, and Veneers

  • Sprayed Fire-Resistant Materials

  • Mastic and Intumescent Fire-Resistant Coatings

  • Exterior Insulation and Finish Systems (IEFS)

  • Alternative Materials—OTCR Building Bulletin

  • Smoke Control Systems

  • Mechanical Systems

  • Fuel-Oil Storage and Fuel-Oil Piping Systems

  • High-Pressure Steam Piping (Welding)

  • High Temperature Hot Water Piping (Welding)

  • High-Pressure Fuel-Gas Piping (Welding)

  • Structural Stability—Existing Buildings

  • Excavations—Sheeting, Shoring, and Bracing

  • Underpinning

  • Mechanical Demolition

  • Raising and Moving of a Building

  • Soil Percolation Test—Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities

  • Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities Installation

  • Individual On-Site Private Sewage Disposal Systems Installation

  • Soil Percolation Test—Individual On-Site Private Sewage Disposal Systems

  • Sprinkler Systems

  • Standpipe Systems

  • Heating Systems

  • Chimneys

  • Fire-Resistant Penetrations and Joints

  • Aluminum Welding

  • Flood Zone Compliance 

  • Luminous Egress Path Markings (TR7)

  • Emergency and Standby Power Systems (Generators)

  • Post-Installed Anchors

  • Seismic Isolation Systems

  • Concrete Design Mix (TR3)

  • Concrete Sampling and Testing (TR2)

 

Progress Inspections:

  • Preliminary

  • Footing and Foundation

  • Lowest Floor Elevation 

  • Structural Wood Frame

  • Energy Code Compliance Inspections (TR8)

  • Fire-Resistance Rated Construction

  • Public Assembly Emergency Lighting

  • Final

 

Energy Inspections:

  • Protection of Exposed Foundation Insulation

  • Insulation Placement and R Values

  • Fenestration U-Factor and Product Rating

  • Fenestration Air Leakage

  • Fenestration Areas

  • Air Sealing and Insulation—Visual

  • Air Sealing and Insulation—Testing

  • Loading Deck Weather Seals

  • Vestibules

  • Fireplaces

  • Shutoff Dampers

  • HVAC and Service Water Heating Equipment

  • HVAC and Service Water Heating Systems Controls

  • HVAC Insulation and Sealing

  • Duct Leakage Testing

  • Electrical Energy Consumption

  • Lighting in Dwelling Units

  • Interior Lighting Power

  • Exterior Lighting Power

  • Lighting Controls

  • Electrical Motors

  • Maintenance Information

  • Permanent Certificate

  • Solar Ready Requirements


Need a Special Inspection ASAP?